Six hours of work, and a decision that remained mine — video transcript Silent 60-second sequence. Selected still frames from the two supplied screen recordings are held for readability. These are reports from the agent workflow, not a continuous recording of six hours. The closing card reproduces a later message supplied by the operator. 00:00–00:12 — My role: review and direction Roughly six hours of essentially autonomous execution by HART, according to the operator's account. Two cropped operator messages from the earlier recording at 00:30: “how is review pressure ? are you making relevant git-hart proposal and assuming independent review is the fast reviewer” “integrate so it doesn't go stale” The messages are shown as separate crops; the intervening agent reply reports an approved proposal awaiting integration. 00:12–00:21 — The final bounded comparison The 44m 49s timer covers the final segment of the six-hour workstream. Screen excerpt: “I’ll proceed with the one-call Sol comparison: the identical REQ-080 input, no repair feedback, and independent review afterward. I’ll verify the Sol route, implement and review the bounded comparison path, then run it within the existing allowance. Expansion stays stopped while we assess the result.” 00:21–00:30 — A defect caught before the call The model route was corrected within the comparison scope. Screen excerpt: “Sol is available, but we caught a routing issue before spending a call: changing the local receipt alone would still send the request to Luna. I’m adding an explicit mapping for this comparison to the existing Sol gateway route, with both route identities recorded and checked. No global routing change is needed.” 00:30–00:39 — Independent review before integration The workflow reported 1,858 tests passing and the retained input reproduced. Screen excerpt: “The independent reviewer also passed all 1,858 tests and reproduced the retained input. A separate read-only check fetched the three original live checkpoints; they match too. The reviewer is finishing the receipt check before I integrate and deploy.” 00:39–00:48 — The approved change was integrated Git-Hart review and integration were carried forward within the workflow. Screen excerpt: “Independent approval is recorded. I detached main, integrated the approved tree, and reattached at 2592463. Review pressure is clear. I’m moving on to the reviewed-image deployment and a no-call production preflight before releasing the single comparison call.” 00:48–01:00 — Qualification remained blocked Final handoff after the last 44m 49s segment. This is typeset text from the later operator-supplied message, not a video frame. “The Sol comparison improved attribution and citations, but independent review still found one material missing citation. Quality qualification remains blocked.” One call used. 31 of 34 calls consumed; three unused.